Search Zoning Ordinance
<<Back to Planning Department
BAKER COUNTY
ZONING AND SUBDIVISION
ORDINANCE #83-3
Table of Contents
ArticleSection
Show details for ARTICLE 1: INTRODUCTORY PROVISIONSARTICLE 1: INTRODUCTORY PROVISIONS
Show details for ARTICLE 2: ESTABLISHMENT OF ZONES AND MAPSARTICLE 2: ESTABLISHMENT OF ZONES AND MAPS
Hide details for ARTICLE 3: USE ZONESARTICLE 3: USE ZONES
SECTION 301 EXCLUSIVE FARM USE ZONE (EFU)
SECTION 301.01 PERMITTED USES
SECTION 301.02 CONDITIONAL USES
SECTION 301.03 DWELLINGS IN THE EFU ZONE
SECTION 301.04 USES NOT PERMITTED
SECTION 301.05 MINIMUM PARCEL SIZES
SECTION 301.06 STANDARDS FOR CONDITIONAL USES IN THE EFU ZONE
SECTION 302.01 TIMBER-GRAZING ZONE PERMITTED USES
SECTION 302.02 CONDITIONAL USES
SECTION 302.03 FARM OR FOREST MANAGEMENT DWELLINGS
SECTION 302.04 SINGLE FAMILY DWELLING NOT RELATED TO FOREST MANAGEMENT
SECTION 302.05 CONDITIONAL USE PERMIT
SECTION 302.06 SITING STANDARDS FOR STRUCTURES AND DWELLINGS IN THE TIMBER-GRAZING ZONE
SECTION 302.07 FIRE SITING STANDARDS FOR STRUCTURES AND DWELLINGS IN THE TIMBER-GRAZING ZONE
SECTION 302.08 FIRE SAFETY DESIGN STANDARDS FOR PRIVATE ROADS AND DRIVEWAYS
SECTION 302.09 PROPERTY DEVELOPMENT STANDARDS
SECTION 302.10 MINIMUM PARCEL SIZES
SECTION 303 RURAL RESIDENTIAL ZONE (RR-5)
SECTION 303.01 PERMITTED USES
SECTION 303.02 CONDITIONAL USES
SECTION 303.03 MINIMUM LOT SIZE
SECTION 303.04 LIMITATIONS ON USES
SECTION 304.01 PERMITTED USES
SECTION 304.02 CONDITIONAL USES
SECTION 304.03 MINIMUM LOT SIZE
SECTION 305.01 PERMITTED USES
SECTION 305.02 CONDITIONAL USES
SECTION 305.03 ADDITIONAL CRITERIA FOR CONDITIONAL USES
SECTION 305.04 MINIMUM LOT SIZE
SECTION 306 PRIMARY FOREST ZONE (PF)
SECTION 307 MINERAL EXTRACTION ZONE (ME)
SECTION 307.01 PERMITTED USES
SECTION 307.02 CONDITIONAL USES
SECTION 307.03 MINIMUM LOT SIZE
SECTION 308 SURFACE MINING ZONE (SM)
SECTION 308.01 PERMITTED USES
SECTION 308.02 CONDITIONAL USES
SECTION 308.03 MINIMUM LOT SIZE
SECTION 308.04 LIMITATION ON USES
SECTION 309 TOURIST COMMERCIAL ZONE (TC)
SECTION 309.01 PERMITTED USES
SECTION 309.02 LIMITATIONS ON USES
SECTION 310 GENERAL COMMERCIAL ZONE (GC)
SECTION 310.01 PERMITTED USES
SECTION 310.02 CONDITIONAL USES
SECTION 310.03 LIMITATIONS ON USE
SECTION 311 COMMERCIAL INDUSTRIAL ZONE (CI)
SECTION 311.01 PERMITTED USES
SECTION 311.02 CONDITIONAL USES
SECTION 311.03 LIMITATIONS ON USE
SECTION 312 AIRPORT DEVELOPMENT ZONE (AD)
SECTION 312.01 PERMITTED USES
SECTION 312.02 CONDITIONAL USES
SECTION 312.03 LIMITATIONS ON USES
SECTION 313 AIRPORT OVERLAY ZONE (AO)
SECTION 314 INDUSTRIAL ZONE (I)
SECTION 314.01 PERMITTED USES
SECTION 314.02 CONDITIONAL USES
SECTION 314.03 CRITERIA FOR CONDITIONAL USE
SECTION 314.04 LIMITATIONS ON USES
SECTION 315 SUMPTER VALLEY MANAGEMENT AREA ZONE (SVMA)
SECTION 316 RESERVED FOR FUTURE EXPANSION
SECTION 317 SUMPTER VALLEY OVERLAY ZONE (SVOZ)
SECTION 318 LIMITED USE COMBINING ZONE (LU)
Show details for ARTICLE 4: SUPPLEMENTARY PROVISIONSARTICLE 4: SUPPLEMENTARY PROVISIONS
Show details for ARTICLE 5: EXCEPTIONSARTICLE 5: EXCEPTIONS
Show details for ARTICLE 6: CONDITIONAL USESARTICLE 6: CONDITIONAL USES
Show details for ARTICLE 7: PLANNED UNIT DEVELOPMENTSARTICLE 7: PLANNED UNIT DEVELOPMENTS
Show details for ARTICLE 8: VARIANCESARTICLE 8: VARIANCES
Show details for ARTICLE 9: AMENDMENTSARTICLE 9: AMENDMENTS
Show details for ARTICLE_10: MAJOR PARTITIONS MINOR PARTITIONSARTICLE_10: MAJOR PARTITIONS MINOR PARTITIONS
Show details for ARTICLE_11: ADMINISTRATIVE PROVISIONSARTICLE_11: ADMINISTRATIVE PROVISIONS
Show details for ARTICLE_12: GENERAL PROVISIONSARTICLE_12: GENERAL PROVISIONS